UmemeImekamilika
Install UPS and inverter wiring for 2 rooms
Bajeti
NGN 41,300Bei maalum
Unaihitaji lini
Wakati wowote
Asubuhi
Mji
Surulere, Lagos
Mtandaoni kwa Ulinzi wa Malipo
Need wiring for UPS backup to 2 rooms (fans and lights). UPS and battery already bought. Separate wiring line required.

· 145 watazamaji
Mahali pa kukadiria. Anwani kamili hutolewa baada ya kuweka nafasi.
Ofa (2)
Maswali
Bado hakuna maswali.